Located near Tahsis, BC,
on Vancouver Island, the proposed McKelvie Project would provide 5.2 MW of run-of-river
power. Both a water licence and land tenure have been issued from the Province of
British Columbia.
The Newcastle Hydro
Project is to be located on Newcastle Creek on Vancouver Island near the Village of
Sayward. It has a proposed installed capacity of 4.3 MW. Synex Energy is continuing to
advance the regulatory aspects of this project. Both a water licence and land tenure
have been issued from the Province of British Columbia.
Located 7km southeast of
Port Alice, BC, on Vancouver Island, this proposed project would provide 10 – 15MW of
power and has lake storage available. The Victoria Lake Limited Partnership, owned by
Synex Energy Resources Ltd. and another energy developer, is the owner and proponent of
the project.
Development Sites |
||
---|---|---|
Site Name |
Power (MW) |
|
Montague |
3.4 |
|
Victoria Lake |
9.9 |
|
Ucona |
12 |
|
Newcastle |
4.3 |
|
McKelvie |
3.4 |
|
Exstew - Unnamed Trib 2 |
9.5 |
|
Exstew - Unnamed Trib 3 |
10 |
|
Exstew River |
37.4 |
|
Exstew - Unnamed Trib 4 |
7 |
|
Exstew - Unnamed Trib 4B |
8.4 |
|
Exstew - Unnamed Trib 5 |
10.5 |
|
ZZ Creek - West of Terrace |
14.9 |
|
Racoon Creek |
18.5 |
|
Klite River |
18.8 |
|
Seshal Creek |
17.9 |
|
Ayton |
4.3 |
|
Khtada |
15.2 |
|
Potential Total Power |
205.4 MW |